Progress On Implementation

After the Bidding Phase COLMAN-air makes the construction drawings for the technical installations, not only plan drawings (1:50) but also the necessary sections and details get on the drawings.

For equipment rooms the drawings normally (1:20) is COLMAN-air specialism to warrantee also a maintenance friendly way for the next 30 years.

This Phase is always with other parties like supplier, system contractor and Local Design Institute.

This phase save the client in the construction time a lot of discussion on the construction site, and meetings over not 100% clear situations, but also extra work reduce to nearly zero.